Industrial
facility
design
in
Kazakhstan
We solve engineering and architectural problems of any complexity, providing our clients
with a professional approach at
all stages of design.
Our Facilities that have changed industries
-
Foundry
Kostanay region- 76,000 units/year
- 45,000 tons of cast iron products
- BIM and 3D modeling
- Compliance with standards
- Energy efficient, reliable, and easy to maintain
- Optimal equipment placement
-
Meat processing plant
Arkalyk- The land area is 4,9074 ha
- Semi—finished products workshop - 500 kg of dumplings/shift
- Output — up to 10 tons/shift
- Refrigeration equipment — KRG LLP
- Automation of basic technological processes
-
Poultry farming complex
Kostanay region- 3 million broilers/year
- Pas Reform Equipment
- Energy-efficient wall panels and purlins
- Feed mill: 5 tons/hour
- Parent stock poultry house: 4,300 heads
-
Elevator “Olzha”
Kostanay region- Grain storage: 100,000 tons
- Loading capacity: 100–200 tons/hour
- Unloading capacity: 100 tons/hour
- Strong and durable structures
- Control Center: Process Automation
-
Oatmeal Factory
The village of Pokrovka- Productivity: 2 tons/hour
- Full automation of processes
- BUHLER equipment
- 3D modeling
- Collection and safe disposal of waste
-
Industrial grain storage
Kostanay region- Receiving and weighing grain
- Loading and unloading grain
- Internal transportation
- Cleaning and sorting of grain
- Complete mechanization of processes
-
Industrial-automated greenhouse
Kyzylorda- 721.59 tons of tomatoes / 929.94 tons of cucumbers per year
- Modular design of complex shape
- Full automation of growing processes
- Idromeccanica Lucchini equipment
- BIM and 3D modeling
-
Project of the Localization Center
Kostanay city- Area — 28,000 m²
- Area (AUC) — over 2,000 m²
- Height of the AUC — 4 floors
- Complete reconstruction and modernization
- Client — Agromashholding KZ JSC
-
Foundry
Kostanay region- 76,000 units/year
- 45,000 tons of cast iron products
- BIM and 3D modeling
- Compliance with standards
- Energy efficient, reliable, and easy to maintain
- Optimal equipment placement
-
Meat processing plant
Arkalyk- The land area is 4,9074 ha
- Semi—finished products workshop - 500 kg of dumplings/shift
- Output — up to 10 tons/shift
- Refrigeration equipment — KRG LLP
- Automation of basic technological processes
-
Poultry farming complex
Kostanay region- 3 million broilers/year
- Pas Reform Equipment
- Energy-efficient wall panels and purlins
- Feed mill: 5 tons/hour
- Parent stock poultry house: 4,300 heads
-
Elevator “Olzha”
Kostanay region- Grain storage: 100,000 tons
- Loading capacity: 100–200 tons/hour
- Unloading capacity: 100 tons/hour
- Strong and durable structures
- Control Center: Process Automation
-
Oatmeal Factory
The village of Pokrovka- Productivity: 2 tons/hour
- Full automation of processes
- BUHLER equipment
- 3D modeling
- Collection and safe disposal of waste
-
Industrial grain storage
Kostanay region- Receiving and weighing grain
- Loading and unloading grain
- Internal transportation
- Cleaning and sorting of grain
- Complete mechanization of processes
-
Industrial-automated greenhouse
Kyzylorda- 721.59 tons of tomatoes / 929.94 tons of cucumbers per year
- Modular design of complex shape
- Full automation of growing processes
- Idromeccanica Lucchini equipment
- BIM and 3D modeling
-
Project of the Localization Center
Kostanay city- Area — 28,000 m²
- Area (AUC) — over 2,000 m²
- Height of the AUC — 4 floors
- Complete reconstruction and modernization
- Client — Agromashholding KZ JSC
A comprehensive approach with ten years of experience
Our goal is to lay a solid foundation on which the entire project will be confidently built: from project documentation to construction and commissioning. This is not just design, it is strategic thinking in the interests of your future facility.
What we do:
-
01
Analyze the technical and economic parameters
of the future facility - 02 Develop engineering and architectural solutions taking into account operating standards and conditions
- 03 Determine the optimal location of production, storage, and administrative areas
- 04 Prepare the documents, visualizations, and diagrams necessary for further design and approval work